|
Jobsite and Equipment photos>
Silver Tsunami (tm) 175HP Thruster
These self-contained, fully assembled units were shipped 'Turn-Key'. The entire installation, including Wheel House Controls and Thrusters was completed in less than 1 day.
© H.M.S. Inc. 2007-2012 all rights reserved
|